Cherry sheet estimates

The Massachusetts Department of Revenue is releasing Medfield’s state aid estimates for the fiscal year that just started July 1 (copy attached below).  Our state aid went up over the prior fiscal year about $140,000, but I do not make sense of the year over year decrease in the Local Aid Assessments.

============================================================

FY2018 Preliminary Cherry Sheet Estimates

The Division of Local Services has posted on its website preliminary cherry sheet estimates based on the Conference Committee budget recommendations approved by the legislature on Friday.

 

General Government: Unrestricted Gen Gov't Aid 1,393,771 1,448,128 1,448,128 1,448,128 1,448,128 Local Sh of Racing Taxes 0 0 0 0 0 Regional Public Libraries 0 0 0 0 0 Urban Revitalization 0 0 0 0 0 Veterans Benefits 22,422 16,487 15,060 15,060 15,060 State Owned Land 27,925 27,925 27,898 27,898 27,898 Exemp: VBS and Elderly 28,416 36,842 36,842 36,842 36,842 FY2018 Local Aid Estimates Medfield FY2017 Cherry Sheet Estimate FY2018 Governor's Budget Proposal FY2018 House Budget Proposal FY2018 Senate Budget Proposal FY2018 Conference Committee Education: Chapter 70 6,063,084 6,112,884 6,137,784 6,137,784 6,137,784 School Transportation 0 0 0 0 0 Charter Tuition Reimbursement 893 10,919 13,908 14,013 13,415 Smart Growth School Reimbursement 0 0 0 0 0 Offset Receipts: School Choice Receiving Tuition 0 0 0 0 0 Sub-total, All Education Items: 6,063,977 6,123,803 6,151,692 6,151,797 6,151,199 Offset Receipts: Public Libraries 15,422 16,164 16,776 17,217 16,164 Sub-Total, All General Government 1,487,956 1,545,546 1,544,704 1,545,145 1,544,092 Total Estimated Receipts 7,551,933 7,669,349 7,696,396 7,696,942 7,695,29120170711-CherrySheetBudgets_Page_220170711-CherrySheetBudgets_Page_3

More on chip seal

I asked Maurice Goulet, the Director of the DPW, a follow up question about chip seal and got more really useful information back from him this morning (a copy of that email appears below – I also inserted Moe’s original information at the end).  The “capital” he references is the town’s annual capital budget, which typically allocates monies to resurface subdivision roads.

chip seal

On Sat, Jul 8, 2017 at 11:26 AM, Osler L. Peterson <osler.peterson@verizon.net> wrote:

Moe,

I am sorry to be late in responding to your materials, but yes, that is hugely helpful, and exactly the quantification of the cost differential that assists me to understand the magnitude of savings.  I just had time to post your data on my blog, and I am betting that the residents will be equally as appreciative as I am at your putting that material together for us.

So a big thank you from me for doing that and for doing it so well and so clearly.

I guess I do have one follow up chip seal question as I think about it today, namely how many miles of chip seal do we typically do per year?  Even if the savings percentage is really high, if the actual total spending amount is not too great per year, we might still opt to asphalt – e.g. I bet the town residents might opt for pavement over chip seal if it only cost us $100K more per year.  Thanks in advance.

Best,

Pete

Osler L. Peterson, Esq.

===========================================================

Pete,

It would be difficult to give you an estimate in roadway miles as our roadways differ so much in width, however speaking with Bobby Kennedy we average about $150,000 – $200,000 per year on chip seal.

With the calculations I had sent you, it would cost approximately $425,000 – $575,000 for overlay (does not include costs of adjusting castings and repairing driveway aprons) and $555,000 – $750,000 for mill and overlay if we were to resurface the same amount of roadways. This would drastically reduce the number of roadways we could maintain per year. Once our pavement management system is in place, we will have a better understanding of the town’s needs. Even with the pavement management system, it may not consider to utilize chip seal as much, reducing the number of roadways that are resurfaced. (Chapter 90 state funding allotment for Medfield is $395,076 per year plus usually $30,000 – $40,000 from capital) The roadways that are not resurfaced puts added pressure on the Highway Division for maintenance throughout the year.

Thanks,

===========================================================

From: Maurice Goulet [mailto:mgoulet@medfield.net]
Sent: Friday, July 7, 2017 8:30 AM
To: Osler L. Peterson <osler.peterson@verizon.net>
Cc: Mike Sullivan <msullivan@medfield.net>
Subject: Chip Seal and Overlay Comparison

Pete,

Below is a comparison of Chip Sealing roadways vs. Pavement Overlay and/or Mill and Overlay as requested.

Consider a scenario of 1 mile of roadway that is 20 feet wide at current contractor prices:

5,280 feet long X 20 feet wide / 9 = 11,733 square yards

$24,639 – chip seal

$69,922 – pavement overlay

(65% savings)

(pavement overlay does not include raising structures such as catch basins, manholes and gates, and reconstructing driveway aprons affected by raising pavement elevation, pavement elevation changes also creates new drainage issues)

Overlaying on a distressed roadway develops reflective cracking through the new surface within a few years affecting longevity of the surface. Milling (grinding) and overlay would then be considered as the preferred method.

$24,639 – chip seal

$91,628 – mill and overlay

(73% savings)

 

Please let me know if you have any questions. Hope this is helpful.

Maurice G. Goulet

Director of Public Works

Medfield, Massachusetts

 

Medfield Garden Club requests town’s financial support

 

Medfield Garden Club.png 

Medfield Garden Club Request for Funding for TASC (Town Area Sites)

 

 

The Medfield Garden Club is requesting $2500 from the Town of Medfield’s Local Meal Tax Fund to defray the cost of renovation for several of its civic planting sites and to contribute to the ongoing maintenance of the club’s twenty-three sites in town.

 

The Medfield Garden Club was  established in 1933 for the purpose of community beautification, conservation, and education. The first civic plantings by the club were done in 1935 when Medfield Garden Club members planted trees at schools and the police station. The club has a long history of volunteerism in town. The Medfield Garden Club currently maintains twenty-three TASC sites around Medfield with four season interest. The sites include the Town Hall and the Medfield Public Library, the stone planters at the entrances to the town serving as a welcome to Medfield, and many island and container gardens  within the downtown area.  These sites require the year-round efforts of thirty-five Medfield Garden Club volunteers and a budget of $4900. In addition to the twenty-three island and container gardens, the Medfield Garden Club provides the winter wreaths, swags, and greens for the Town House, the Medfield Public Library and the gazebo.

 

Rationale

 

For nearly eighty-five years, the club has self-funded its efforts to maintain its civic beautification sites through two major fundraisers:  a spring plant sale and a winter holiday greens sale. Unfortunately, over time, these fundraisers have contributed less and less to our revenue due to increased competition with inexpensive nursery or outlet stock, fewer people gardening and more people having landscapers buy and install plants for homeowners and rising prices on the cost of our materials.

 

The Medfield Garden Club is in need of financial assistance to perform our site renovations and ongoing maintenance. We are requesting that the Town of Medfield partner with us to ensure the continuation of our beautification efforts in the community. The Medfield Garden Club is committed to keeping these twenty-three sites looking their best season to season and year to year. With that goal in mind, the club began making major changes to our TASC sites starting this spring in 2017. Renovations will continue through the summer of 2018.

 

 

Schedule and Scope of Work

 

We are transitioning from annuals, which are expensive, water hungry plants, to native plants, to more drought resistant  perennials and to dwarf shrubs. This plan is expensive for start-up costs, but we expect it will pay off over the years with more consistent beauty and hardier plants and with lower maintenance and watering needs. We are utilizing non-toxic water saving crystals in most of the container gardens to further reduce watering needs.

 

We are also in the process of renovating several sites to neaten and provide continuity among the island gardens with granite curbing and an edging of river stone and mulch. Bobby Kennedy and the DPW crew have been very responsive and helpful as we make some of these hardscaping upgrades. The DPW did a wonderful job building the stone planters at the entrances to Medfield, the DPW site, and at Knollwood and South Streets. The stone planters were installed one at a time over the last several years and are a beautiful welcome into our community.

 

Additionally, we working with John Thompson to include stone and other artifacts from the Medfield State Hospital to serve as focal points in the island gardens that bookend the Hospital district.

 

The combination of these efforts will result in more aesthetically pleasing gardens that will be easier and less costly to maintain in terms of worked hours,  dollars and water usage.

 

Summary

 

Michele Feinsilver, president of the Medfield Garden Club, and I had a recent discussion with Mr. Sullivan who suggested that we request funding from the Local Meals Tax Fund, since most of our sites are within the downtown area and go a long way towards enhancing the appearance of the Town to residents and passersby. To that end, we are requesting $2500 from the Town of Medfield for the renovation and maintenance of our twenty-three sites. All thirty-five of our TASC site volunteers report community members stopping to admire the club’s plantings and to thank us for all we do to beautify the town.

 

Thank you for your consideration and contribution to our ongoing volunteer efforts.

 

Nancy Tella

Chairperson, TASC Sites

Medfield Garden Club

 

 

 

 

 

 

 

 

 

 

 

Locations of the 2017 Medfield Garden Club TASC Sites

 

DPW Stone Planter

Harding and West Mill Streets

Hospital Road and Harding Streets

Hospital Road and Route 27

Hospital Road at McCarthy Field

Library Containers

Library In-ground, Native Shade Garden and Walkways

Meeting House Pond

North and Farm Street

North and Harding Streets

North and Pine Streets

North Street and Route 109

Safety Building, Dale Street

Route 109 and Causeway Streets

Route 109 and Hartford Street

Route 109 East Stone Planter

Route 109 West Stone Planter

Route 27 South Stone Planter

Routes 109 and 27

South and Knollwood Streets

South and Philip Streets

South Street Extension and Route 27

Town Hall

 

Total TASC Four Season Budget 2017

 

Costs for soil, plant material, annuals and perennials, holiday and seasonal decorations for individual sites and containers

 

In-ground Sites                                 12@$150 each                                                                  $1800

Small Containers                              7@$150 each                                                                    $1050

Large Containers                              8@$200 each                                                                    $1600

 

Town Hall/Library/Gazebo Winter Greens

Six (6) large wreaths, two (2) regular wreaths, ten (10) swags                                       $ 450

 

Total TASC Budget for 2017                                                                                                          $4900

 

Volunteer Hours Necessary to Maintain Sites

 

The Medfield Garden Club has one TASC coordinator who oversees all sites and site managers. The club has thirty-five site managers who are responsible for planting, weeding and watering on a weekly or twice weekly basis depending on the specific site needs, weather and time of year. Currently, mulch, river stones and curbing is provided by the Town DPW. Water continues to be a pressing issue at most sites and safety is always a concern because the sites are primarily located on highways and byways.

For the state budget wonks

This came yesterday too, from former resident and legislature watcher, John Nunnari:

State-House-smaller_1 (1)

HOUSE, SENATE RUSH OVERDUE $40.2 BILLION BUDGET TO BAKER [+MEDIA]

By Michael P. Norton
STATE HOUSE NEWS SERVICE

STATE HOUSE, BOSTON, JULY 7, 2017…..Largely discarding spending plans they approved in the spring, the House and Senate on Friday sent Gov. Charlie Baker a $40.2 billion state budget that holds state spending flat, includes higher employer health care assessments, and, according to some Democrats, underscores the need for higher taxes and new revenues.

The bill was rushed through the House on a 140-9 vote and then cleared the Senate 36-2. After the votes, Democratic legislative leaders offered differing points of view on their final product.

“In the midst of a tough fiscal climate we’ve delivered a responsible budget that makes targeted investments and protects our most vulnerable citizens,” House Speaker Robert DeLeo said. “I am particularly proud of the work we’ve done on early education and care – which will have a lasting impact on both the workforce and the Commonwealth’s children – and supporting those battling addiction.”

Senate President Stanley Rosenberg took a more dim view of the budget, calling it “the harshest state budget since the last recession.”

“It would have been somewhat better had it contained the Senate’s modest revenue proposals including those on Airbnb, internet hotel resellers, flavored cigars, film tax, and the Community Preservation Act,” he said. “We can take some measure of pride in what we were able to do for local aid, children, and veterans, but too many were left behind.”

Lawmakers put aside many investments they had planned and settled for a budget with a bottom line that roughly mirrors projected state spending for last fiscal year. They did so because tax revenue growth forced them to mark down available revenues by $733 million.

“This budget is not without pain,” Senate Ways and Means Chairwoman Karen Spilka told reporters. “It’s clear that the state is facing a shortfall in revenue that will have an impact on real people’s lives and there are cuts throughout this budget.”

SHNS Video: Sen. Spilka briefing

Asked to identify some of the cuts she described as painful, Spilka said there were reductions in the Executive Office of Human Services and lawmakers were unable to preserve full funding for an account that helps cities and towns pay special education costs.

Spilka said members of a conference committee also pulled aside $104 million for a new reserve fund to cover spending in county sheriff offices and the Committee for Public Counsel Services, the state’s public defender agency. The revenue gap was primarily covered through $502 million in spending reductions, $205 million in “efficiencies and reversions” and the $83 million in revenue from not meeting a trigger to reduce the income tax rate, Spilka said.

House budget chief Rep. Brian Dempsey said the revenue markdown forced $400 million in changes to line items, but said he would hesitate to describe them as cuts because he said in many cases fiscal 2018 spending levels will be higher than levels in the original fiscal 2017 budget.

“These reductions are never easy,” Dempsey said.

SHNS Video: Rep. Dempsey briefing

The Department of Developmental Services will receive a $57 million increase over last year’s budget, but not the $84 million increase the House had initially proposed, Dempsey said.

The budget, Dempsey said, recognizes the problem of “revenue growth slippage” — Spilka called it a “new fiscal reality” — but still invests $40 million in unrestricted local aid, $119 million more in school aid, and $15 million to address the salaries of early education workers.

“I am very pleased that local aid was maintained,” said House Minority Leader Brad Jones, who took issue with the budget development process, which has been marked by a high level of secrecy. Jones also suggested the budget was balanced only by consciously underfunding accounts.

Rep. James Lyons, an Andover Republican, said the budget is predicated on “hopeful” levels of revenue growth, suggesting a 2.9 percent rate of growth is too optimistic since collections over the past year have grown by about 1.4 percent. “These revenue numbers are not going to meet the expectations,” Lyons said.

Another Republican, Rep. Shaunna O’Connell of Taunton, said the rushed vote on the bill that was released Friday morning made it “impossible” for legislators to know for sure what was in the budget and what had been left out.

Senate Democrats shot down a bid by Senate Minority Leader Bruce Tarr to give senators more than a few hours to read the budget before voting on it. Noting an interim budget is in place for the month of July, Tarr said the Senate could afford to postpone the vote until next week.

“It is inappropriate for us at this time to consider a document filed just a few hours ago,” the Gloucester Republican said. “It is more than 320 pages and spends more than $40 billion, which members have had a chance to review for only a very short period of time.”

Sen. William Brownsberger said he viewed Friday’s vote as one of “do I want the state to run or do I not want the state to run.” He noted that the Senate could have waited but that the conference committee report could not be amended regardless.

“We could do it later, but it’s not going to change. The deal’s not going to change,” he said. “I have confidence in the Senate Ways and Means team, I think they did the best they could and it is what it is.”

The budget features new assessments on employers designed to generate $200 million to help the state keep up with the rising costs of MassHealth, the public health insurance program that serves about one million people.

One assessment will boost a per-employee assessment paid by employers from $51 to $77 per year, while another will hit employers with up to $750 per employee if their workers choose MassHealth even though they have access to insurance through their employers.

The new assessments are coupled with plans to reduce the size of a scheduled increase in unemployment insurance rates to $500 million, from $850 million, but House and Senate Democrats discarded MassHealth reforms that Baker recommended in June and which employer groups had hoped would be coupled with the new assessments.

“The proposed state budget fails to honor a compromise reached with the business community that promised reforms alongside any assessment to close MassHealth budget gaps,” Christopher Carlozzi, Massachusetts state director of the National Federation of Independent Businesses, said. “The cost of healthcare is a top issue for Massachusetts small business owners and adding an additional assessment without reining in the cost of a bloated MassHealth program is irresponsible and guarantees the promise of greater budget problems in years to come. The legislature needs to understand that ‘shared responsibility’ is not a one-way street that consistently requires funds from the small business community without addressing the underlying cost drivers.”

Democrats in the Legislature said the budget requires Baker to extract $150 million in savings at MassHealth, but took pride in ruling out eligibility and benefit standard changes. Rep. Christine Barber claimed Baker’s plans would have “undermined” the state’s health care coverage goals.

The compromise budget retains a planned $100 million deposit into the state’s “rainy day” fund, a commitment that Dempsey said could prove important to credit rating agencies who have questioned the strength of the state’s reserves. The deposit would bring the total balance in the fund to $1.4 billion by the end of the fiscal year, but about half of it is contingent on capital gains tax revenues meeting projections.

Dempsey also noted that the House’s marijuana regulation bill, which is still tied up in negotiations, includes $50 million for substance abuse treatment from taxes on retail pot sales, which the House proposed to tax at 28 percent, but the Senate has favored a 12 percent tax.

“It’s a tremendous opportunity, I think, to tax an industry that ought to see a higher tax and use that money really for the betterment of the citizens of the commonwealth and treatment,” he said.

The consensus budget sided with the Senate on a reserve for the implementation of the new marijuana law, appropriating $2 million rather than the House’s approved $4 million.

Jim Borghesani, spokesman for the Yes on 4 Coalition and the Marijuana Policy Project, said the $2 million reserve “falls far short of the funding necessary to build an effective regulatory structure in the time set by the Legislature and the governor.”

“The cost of licensing and tracking software alone, which must be in place before applications can be processed, is estimated at $5.5 million,” Borghesani said. “The Treasurer requested $10 million for the year-one budget. We take elected officials at their word that there will be no more delays, and we hope funding is set at the amount necessary to prevent any more of them.”

The final budget keeps the University of Massachusetts system on track for what UMass President Marty Meehan projected will be a 2 percent to 3 percent hike in student charges this year, including the House’s appropriation of roughly $513 million. Higher education advocates and UMass officials had hoped negotiators would stick with the Senate’s higher figure of $534 million, which was about $4 million shy of the university’s request.

The advocacy group Public Higher Education of Massachusetts said the budget “hurts students and families” by underfunding UMass by $30 million, with state universities and community colleges faring “not much better.”

The budget deal does not include a Senate amendment that municipal officials urged the conference committee to preserve in order to rejuvenate the collapsing partnership between the state and communities that have raised property taxes under the Community Preservation Act.

Lawmakers spared from cuts their planned investments in local aid. “It is absolutely clear that the Legislature looked to protect cities and towns from the state’s revenue challenges,” Geoff Beckwith, executive director of the Mass. Municipal Association, said.

Spilka said budget conferees left out MassHealth reforms recommended by Baker in June dealing with eligibility and benefit changes because they “rejected the notion that we should accept the governor’s health care proposal without the necessary transparency.”

“At a moment when we are rightly horrified by the lack of transparency in the health care debate on the national level, it’s important that we must stick to our principles and ensure such an important proposal for Massachusetts and its residents goes through the proper process,” she said.

According to House officials, the budget is predicated on tax revenues growing 2.9 percent rather than the originally anticipated 3.9 percent, and the budget’s $40.2 billion bottom line is about $1 billion higher than the budget approved at this time last year.

Projected fiscal 2017 spending is estimated at more than $40 billion despite only a 1.4 percent increase in tax revenues last fiscal year, a growth level that prompted Gov. Charlie Baker to hold down agency spending and raid trust funds for nearly $140 million.

Sen. Sonia Chang-Diaz, a Jamaica Plain Democrat who joined Webster Republican Sen. Ryan Fattman in opposing the budget, told the News Service afterward she was “still grappling” with her vote.

“At some point I think you have to be willing to recognize when you are the frog in a boiling pot of water and say, ‘This is not good enough, there are some choices that we could have made without adding a penny to the bottom line that would have done better for the people of Massachusetts,'” she said.

The budget includes “some painful cuts” to elder services programs but does not “appear to materially impair these services overall,” according to Mass. Home Care executive director Al Norman. More than $5.6 million was cut from Executive Office of Elder Affairs line items, according to Norman, who said there should still be sufficient funding to avoid a waiting list for home care services.

Supporters of a proposed surtax on high earners, a proposal marked for a 2018 ballot vote that could generate $2 billion, say low tax revenue growth, rising health care costs and spending demands, and the threat of federal funding cuts are forcing the state to weigh new revenues.

“The projected revenue shortfalls forced the Legislature to abandon some of the modest investments their earlier budgets had sought and led to even greater reliance on temporary measures to balance accounts,” Noah Berger, president of the left-leaning Massachusetts Budget and Policy Center, said in a statement. “Unfortunately, this budget does not even begin to make the kind of major long-term investments that would improve our economy and quality of life by expanding educational opportunity for all of our young people and enhancing our failing infrastructure. Doing that would require fixing flaws in our tax system that allow the highest income residents of the state to pay the smallest share of their income in state and local taxes.”

Given the spending choices lawmakers were forced to make, Dempsey said he and other House leaders might be thinking differently about pursuing additional sources of revenue through taxes or other means if it weren’t likely that voters will decide next year whether to impose a 4 percent surtax on income over $1 million.

“If that were not out there, I think you’d look at it a little bit differently,” Dempsey said.

Newton mayor and Democratic gubernatorial candidate Setti Warren released a statement Friday afternoon expressing concerns with the spending plan.

“By continuing the annual spectacle of using one-time fixes, fiscal sleights of hand and gimmicks to fix the budget, Beacon Hill has decided we are a Commonwealth that will not recognize the truth that state government needs new revenue,” Warren said. “If we don’t fix this broken budget process – if we don’t stand up and demand transparency and admit that we need new revenue – the toll on the Commonwealth will only get worse. The key question facing us is what kind of Commonwealth we want to be. This budget and the way it was developed and passed suggest the Commonwealth we are becoming needs to change.”

Warren also criticized the conference committee’s omission of language directing officials to study the feasibility of building a high-speed rail line between Boston and Springfield. The Senate had unanimously backed the study, an amendment offered by East Longmeadow Democrat Sen. Eric Lesser, saying it train service would allow for a better link between the economies of greater Boston and western Massachusetts. Baker vetoed a similar study from last year’s budget.

[Matt Murphy, Katie Lannan and Colin A. Young contributed reporting.]

END
07/07/2017

Serving the working press since 1894
http://www.statehousenews.com

For assistance with your subscription to the State House News Service, reply to this message or e-mail news@statehousenews.com.

MMA says state budget protected municipalities

This alert came yesterday from the Massachusetts Municipal Association with its analysis of the state budget that passed the legislature this week: “Legislators recognize that cities and towns have already passed their fiscal 2018 budgets, which is why they protected the UGGA and Chapter 70 increases that were announced earlier this year and included in the House and Senate budgets.”

MMA

July 7, 2017
 

LEGISLATURE’S FY 2018 STATE BUDGET FULLY FUNDS 39.9 MILLION UGGA INCREASE

LAWMAKERS VOTE TODAY ON THE BUDGET AFTER LOWERING FY 2018 REVENUE ESTIMATES BY $700M

IN SPITE OF WIDESPREAD CUTS TO STATE ACCOUNTS, LEGISLATORS MAINTAIN KEY INVESTMENTS IN MUNICIPAL AND SCHOOL AID

• INCLUDES THE FULL $39.9M INCREASE IN UNRESTRICTED MUNICIPAL AID (UGGA)

• INCREASES CHAPTER 70 TO $4.75B TO FUND MINIMUM AID AT $30 PER STUDENT

• CH. 70 INCLUDES $12.5M TO PROTECT AGAINST LOST FUNDING FOR LOW-INCOME STUDENTS

• ADDS $4M TO SPECIAL EDUCATION CIRCUIT BREAKER

• LEVEL-FUNDS MOST OTHER MUNICIPAL AND SCHOOL ACCOUNTS

• AIRBNB LODGING TAX REFORMS DEFERRED TO SEPARATE LEGISLATION 

 

Earlier this morning, the Legislature’s budget conference committee reported out a lean $40.2 billion fiscal 2018 state budget plan that is based on a $700 million reduction in expected tax revenues for next year. Very weak tax collections this year have created a $440 million hole in the FY 2017 budget, and forced lawmakers to make a $700 million downward adjustment in their FY 2018 forecast.

The House and Senate have scheduled formal sessions for this afternoon (Friday, July 7th), and it is expected that legislators will vote to approve and send the budget to Governor Baker today. The Governor will then have 10 days to sign, veto or recommend changes to the appropriations and outside sections.

While the Legislature’s budget enacts widespread reductions in state budget accounts, Representatives and Senators are clearly protecting and prioritizing municipal and school aid, as the conference committee budget (H. 3800) makes key investments in local aid priorities, including a $39.9 million increase in unrestricted municipal aid (UGGA), a $119 million increase in Chapter 70 school aid, and a $4 million increase in special education reimbursements. The remaining accounts are generally level funded.

Legislators recognize that cities and towns have already passed their fiscal 2018 budgets, which is why they protected the UGGA and Chapter 70 increases that were announced earlier this year and included in the House and Senate budgets. Any last-minute reductions in UGGA or Chapter 70 would have disrupted local budgets and forced mid-year cuts. Fortunately, lawmakers went to great lengths to prevent this.

Please Click this Link Now to Download H. 3800, the Legislature’s Fiscal 2018 Budget – You Can See Your Community’s UGGA and Chapter 70 Amounts in Section 3 of the Budget, which Starts on Page 226
$39.9 MILLION INCREASE IN UNRESTRICTED MUNICIPAL AID
In a major victory for cities and towns, the Legislature’s fiscal 2018 budget plan provides $1.061 billion for UGGA, a $39.9 million increase over current funding – the same increase proposed by Governor Baker and voted by the House and Senate. Almost all of UGGA funding comes from $985M in expected Lottery proceeds and $65M from the Plainridge gaming facility. The full $39.9 million UGGA increase is a top priority for cities and towns, because municipalities are counting on these funds to balance their budgets and maintain essential services for their residents.

CHAPTER 70 MINIMUM AID WOULD INCREASE TO $30 PER STUDENT
With $4.75 billion for Chapter 70 aid, the Legislature’s budget includes a $119 million increase in Chapter 70 education aid (this is $27.5 million higher than the $91.4 million increase in House One), providing a minimum aid increase of at least $30 per student (compared to the $20-per-student amount in the Governor’s budget). The Legislature’s budget continues to implement the target share provisions enacted in 2007, and builds on the proposal by the Governor to start addressing shortfalls in the foundation budget framework. The Legislature’s budget increases foundation budget funding by adding more weight to the health insurance cost factor.

The Legislature’s budget includes $12.5M in the Chapter 70 appropriation to hold school districts harmless from changes in the method of counting low-income students. This is similar to the Legislature’s handling of the problem in the fiscal 2017 budget. H. 3800 includes language stating that this “transitional” assistance to address the problems in calculating low-income student costs is included in the per-district distribution amounts listed in Section 3 of the budget.

In the context of a very tight budget year, the Legislature’s increase in Chapter 70 funding is certainly welcome progress. The MMA continues to give top priority to full funding for the Foundation Budget Review Commission’s recommendations, and over the long-term will work to build on this increase.

$4 MILLION INCREASE FOR THE SPECIAL EDUCATION CIRCUIT BREAKER
In another budget advancement for cities and towns, the Legislature’s budget would add $4 million to the Special Education Circuit Breaker program, providing $281 million. The Governor’s budget proposed level-funding at $277 million. The $4 million increase is a step forward, although this is still short of full funding for a vital program that every city, town and school district relies on to fund state-mandated services. The MMA will work to continue building on this welcome increase.

FUNDING FOR CHARTER SCHOOL REIMBURSEMENTS REMAINS FLAT
The Legislature’s budget would level-fund charter school reimbursements at $80.5 million, far below the amount necessary to fully fund the statutory formula that was originally established to offset a portion of the funding that communities are required to transfer to charter schools. The fiscal 2017 funding level is $54.6 million below what is necessary to fund the reimbursement formula that is written into state law. If this program is level funded, the shortfall will grow to an estimated $76.4 million in fiscal 2018. This would lead to the continued and growing diversion of Chapter 70 funds away from municipally operated school districts, and place greater strain on the districts that serve 96% of public school children. Solving the charter school funding problem is a major priority for the MMA.

REGIONAL SCHOOL TRANSPORTATION, PAYMENTS-IN-LIEU-OF-TAXES (PILOT), LIBRARY AID ACCOUNTS, METCO, McKINNEY-VENTO, AND SHANNON ANTI-GANG GRANTS
Compared to current fiscal 2017 appropriations, the Legislature’s fiscal 2018 budget increases Regional School Transportation Reimbursements by $1 million (up to $61.5 million), a very important account for smaller and rural communities. The budget would level-fund PILOT payments at $26.77 million, add $188K to library grant programs, level-fund METCO, and fund McKinney-Vento reimbursements at $8.1 million, a reduction of $250K. The Legislature’s budget would level-fund Shannon Anti-Gang Grants at $6 million.

CONFERENCE COMMITTEE BUDGET DEFERS IMPORTANT IMPROVEMENTS TO THE LOCAL AND STATE LODGING EXCISE TAX TO SEPARATE LEGISLATION
The Legislature’s final budget defers action on important reforms to the room occupancy excise. Progress on this issue will now focus on separate legislation that is being crafted by Rep. Aaron Michlewitz in the House. The Senate budget had included language to close loopholes that allow the increasing variety of transient and other short-term rentals to escape taxation, including rentals through Airbnb and other similar online companies and through on-line re-sellers. These are important steps to bring parity and a level-playing field to the collection of lodging excise payments, and the MMA will continue to work hard to achieve passage this year.

Please Call Your Representatives and Senators Today to Say Thank You for the Local Aid Investments in the Legislature’s Budget – Including the $39.9 Million Increase in Unrestricted Local Aid and the $119 Million Increase in Chapter 70 School Aid

Thank You Very Much!

 

Dale St. 40B developer meeting 7/18

The developer of the proposed Dale Street 40B has scheduled a public meeting about his plans.  Below is the notice the town received yesterday, too late to be included in the select board meeting materials for our 7/11 meeting.

Date: July 5th, 2017 To: Interested Parties & Neighbors From: Medfield Meadows, LLC and Medfield Meadows 2, LLC Re: Neighborhood Meeting- Redesign of 39/41and49 Dale Street Dear Neighbors, We would like to invite you to attend a neighborhood meeting to discuss the revised development proposals planned for 39/41 Dale Street and 49 Dale Street. Based on the feedback previously received from both the neighborhood and the municipality, and after working closely with Masshousing, we have made profound and significant changes to both plans including a major density reduction. We recognize and appreciate that the previous proposals were not well received. We believe the revised concepts have addressed many of the criticisms previously provided. We are interested in soliciting additional feedback on the revised plans and hope that you can attend the meeting which is scheduled for: July 18 at the American Legion in Medfield at 7pm. Some of the differences between the original proposal and the revised proposals include: REVISED PLANS (dated May 2017) PROJECT Medfield Green Grovedale Homes LOCATION NU.MBER OF UNITS 70 Units 25 Units BLDG. TYPES 50 units in a mid- 25 townhouse units rise building on North Meadow Road and 20 Townhouses that more closely resemble the surrounding neighborhood BUILDING HEIGHT Midrise at 50' +/- Townhouse at 35' ORIGINAL PLANS Dated 12/08/17 NORTH/SOUTH COMBINED INTO 1 PROJECT 182 Units - 98 units in the North Parcel - 84 units in the South Parcel. 3 & 4 story mid-rise buildings Midrise at 50' RECEIVED JUL r 7 Z017 MEDFIELD SELECTMEN Townhouse at 35' PARKING 106 spaces 60 spaces 280 spaces PARKING RATIO 1.5 2.4 1.53 Reconfiguration The apartment Townhouses are 3 & 4 story mid-rise building is near the contextual to the buildings DPW, set back 15 surrounding Total reduction of 87 units feet from North neighborhood. Meadows Road. The building height is reduced near neighboring homes. Park area in the center of the development. Landscape buffers along property lines for neighbors and DPW. The townhouses are along the street to provide a more contextual buffer. We still plan on seeking comprehensive permits under Chapter 40B. However, we have not formally filed anything with any Subsidizing Agencies, like MassHousing, as we hope to have the benefit of your comments prior to filing. We look forward to seeing you on July 18 at the American Legion in Medfield at 7pm. John Kelly20170705-John Kelly-meeting notice_Page_2

Chip seal

chip seal

None of prefer the chip seal treatment of our side streets, but given the cost differential, I have come to accept it as a cost effective solution.  Please understand that residents are free to opt at the annual town meeting (ATM) to vote to pave streets with asphalt instead of using chip seal.  All spending decision ultimately belong to us, the residents, at our ATM. –

Since I recently had a resident question me about the use of chip seal on his street and since I have historically heard the same questions, I asked our DPW Director, Maurice Goulet,  if he could quantify the cost savings to share with residents.

=========================================================

Pete,

Below is a comparison of Chip Sealing roadways vs. Pavement Overlay and/or Mill and Overlay as requested.

Consider a scenario of 1 mile of roadway that is 20 feet wide at current contractor prices:

5,280 feet long X 20 feet wide / 9 = 11,733 square yards

 

$24,639 – chip seal

$69,922 – pavement overlay

(65% savings)

(pavement overlay does not include raising structures such as catch basins, manholes and gates, and reconstructing driveway aprons affected by raising pavement elevation, pavement elevation changes also creates new drainage issues)

 

Overlaying on a distressed roadway develops reflective cracking through the new surface within a few years affecting longevity of the surface. Milling (grinding) and overlay would then be considered as the preferred method.

 

$24,639 – chip seal

$91,628 – mill and overlay

(73% savings)

 

Please let me know if you have any questions. Hope this is helpful.

Maurice G. Goulet

Director of Public Works

Medfield, Massachusetts

 

Department of Public Works

55 North Meadows Road

Medfield, MA 02052

(508) 359-8597 office

(508) 359-4050 fax

mgoulet@medfield.net

www.town.medfield.net

BoS 7/11 agenda

The full agenda, with all the supporting attachments runs to over 150 pages, and can be accessed here 20170711-agenda

TOWN OF MEDFIELD MEETING NOTICE I POSTED: TOWN CLERK POSTED IN ACCORDANCE WITH THE PROVISIONS OF M.G.L. CHAPTER 39 SECTION 23A AS AMENDED. Board of Selectmen Board or Committee PLACE OF MEETING DAY, DATE, AND TIME Town House, Chenery Hall Tuesday, July 11, 2017 at 7:00PM AGENDA (SUBJECT TO CHANGE) Call to Order Disclosure of Video Recording Announcement: We want to take a moment of appreciation for our Troops serving in the Middle East and around the World. Appointments 7:00PM Police Chief Meaney requests appointment of two Civil Service Police Officers John Godino Christopher Bonadies 7:15PM David Connor, American Legion Discussion of Veterans Service Officer Position 7:30PM Kristin Chin, Library Director and Michelle Feinsilver, Medfield Garden Club Request for funding for the Medfield Public Library Rain Garden and Native Pollinator Garden Citizen Comment Action Items Maurice Goulet, DPW Director, requests Selectmen to award and sign the paving contract for the Town of Medfield to P.J. Keating. Maurice Goulet, DPW Director, Vote to sign project request for Chapter 90 North Street and Route 109 Maurice Goulet, DPW Director requests Selectmen to sign the agreement with Environmental Partners for the Design of Water Treatment Plant for Wells 3 and 4 Vote to appoint Tim Nugent to the Selectmen's Health Insurance Advisory Committee Jerry McCarty, Facilities Director, requests Selectmen to sign Green Communities Grant Submission Affordable Housing Trust Appointments Discussion Items Discussion of MSH Master Planning Committee and Process Lot 3/Hinkley Property Committee Jurisdiction and Process ALS Study Committee Update Fire Chief Search Committee Update and Timing Licenses and Permits (Consent Agenda) Saint Edwards Planning Committee requests permission to place signs advertising the St. Edwards Golf Tournament on Monday, September 11, 2017 Town Administrator Update Selectmen's Reports Informational Letter from Eversource announcing service interruption at lights at West Street Pole28 from 2-5AM on July 25, 2017 MA Dept of Utilities Notice of Filing and Public Hearings for general rate increases Memo from Town Clerk, Carol Mayer, announcing approval of the Annual Town Meeting Articles EPA announcement delaying the MA MS4 General Permit for one year Letter from resident Ann Thompson seeking appointment to the COA Letter to the Selectmen concerning rising property taxes Letter from DHCD certifying the Town is in compliance with and certification of the Housing Production Plan (Safe Harbor) Notification from Kleinfelder regarding the Release Abatement Measure Plan for Cumberland Farms20170711-agenda_Page_2

MFi camp fund launched

MFi Thermometer_1775

The Medfield Foundation launched a fund this summer to provide camp for needy kids in town, and passes to the swim pond.  Importantly, the camp allows their parents to work.  Please help send all the needy Medfield kids to camp!

Help send a child in need to camp this summer

Did you know there are many lower income families living in Medfield who can’t afford many of the basic necessities in life and who depend on local resources such as the Medfield Food Cupboard, Massachusetts Energy Assistance and even the funds raised through the Medfield Foundation Angel Run? This is an especially difficult time of year for some of these families as they try to figure out childcare for the summer? These families want to send their kids to camp but simply can’t.

That’s where you come in. The Medfield Foundation has been helping raise funds to help Medfield since 2001 with projects such as the original high school turf field, the Dale Street playground, the Angel Run, the Kingsbury Grist Mill and the Straw Hat Park. MFi is now launching a special fundraising effort to help send kids to camp and purchase family passes to Hinkley Pond for local families in need.

A small donation now can make a big difference in the lives of these kids. Our goal is 200 families donating $50 each. Your generosity and support are much appreciated.

Donate Now!

Thank you,

The Medfield Foundation

 

Office hours this Friday

BoS

Selectman Office Hours – this Friday

I hold regular monthly office hours at The Center on the first Friday of every month from 9:00 to 10:00 AM (my litigation schedule permitting).

Residents are welcome to stop by to talk in person about any town matters. Residents can also have coffee and see the Council on Aging in action (a vibrant organization with lots going on).

I can be reached via 508-359-9190 or my blog about Medfield matters https://medfield02052.wordpress.com/, where any schedule changes will be posted.