Category Archives: DPW

Rte. 27 repaving at night 9/14-19

This today from Mike Sullivan –


 

KENNETH P. FEENEY
Superintendent

TOWN OF MEDFIELD
Office of

SUPERINTENDENT OF PUBLIC WORKS

MEDFIELD, MASSACHUSETTS

(508) 359-8505, x3002

September 10, 2014

Dear Resident,

Effective Sunday, September 14, 2014 – Friday, September 19, 2014, there will be work performed on Route 27 from 8pm – 5am from Granite Street to West Street. They will be grinding and paving.

Please contact Ken Feeney, Superintendent of Public Works, at (508) 906-3002 if you have any questions or concerns.

We apologize for any inconvenience this may cause.

Invasive vine – follow up

Active citizen, Chris McCue Potts had recently focused the town on the problem of an invasive vine, and as a result of her efforts progress is being made.  Below are emails from the Superintendent and Director of the MPR, respectively.

Now just to solve the woolly adelgids confirmed by Mike Lueders (thank you Mike!) in the hemlocks by the tennis courts.


 

Tree Warden Hinkley will take care of bridge on Curve St.


From: “Medfield ParksandRecreation”

Sent: Thursday, July 31, 2014 9:23 AM

Subject: Vine Update

Hello All,

The MPR maintenance crew is out today ripping out and bagging as many vines as they can find and then spraying the roots with roundup.  The spread of the vine is all over town.  I noticed it just off they playground on Green Street, at the Pfaff Center and I am sure it has invaded private properties.  Either Ken and/or I will get the Bridge on Curve Street.
Best,

James Snyder, Director of Parks and Recreation

Brothers opening by 7/31

Mike Sullivan reported at the Board of Selectmen meeting last night that the new Brothers Marketplace will open by July 31.  Mike also stated that the selectmen can tour the completed DPW garage on August 9.

People want street repair schedule

I do not often look at the statistics about visitors to my blog, but WordPress posts a bar graph of past visits atop the page where I add new posts, and so I noticed today that there appeared to be a major spike last Thursday.

When I just looked to see why, I learned that a record number of visitors, by far, by a factor of about 2-3 times the next greatest number, had clicked through from a Patch article about planned road repairs.  Patch had picked up my blog post, but did not list the streets, so people had to click through to see which streets were being worked on this summer.

What this tells me is that there is a huge thirst for town information about what departments are planning that directly impacts people.  FYI, my fist two goals on my list for the selectmen this year are to develop a system to push town information to people and to improve the town’s website.

These are the statistics for my blog from last Thursday:


Thursday, June 19, 2014

Views: 805Help
Visitors: 448

Views per Visitor: 1.80

Search Engine Terms

These are terms people used to find your site.

2014-06-19

Search Views
medfield blog peterson 3
pete peterson blog 2
medfield state hospital 1
medfield music assoiciation 1
pete peterson medfield blog 1
pete peterson blog medfield 1
Unknown search terms 3
Total search terms 12

Major road repairs planned

Ken Feeney had given the selectmen the following data ahead of our meeting last night at my request for a list of what road repairs are currently planned by the DPW.  We also got the list of streets to be chip sealed, that I posted yesterday.

This list is a multi-year schedule of road repair plans, perhaps 2-3 from what Ken said last night.  Ken also shared that it costs the town $500,000 to asphalt 2 miles of highway, which is why he does the stone seal on side roads.

By way of correction, Hospital Road was on the list to be chip sealed from yesterday, but Ken said last night that was there only as a reminder to himself that it will be dug up and patched when the new water main is run from well 6 to the new water tower at the former MSH site.

This chart is about the length times the width of the street involved, and hence the amount of asphalt.


Roads L X W 2014
Rte 27 — total 2893 tons — 2″2″ overlay

High St, Spring St, Granite St – 19 Spring St   6888 x 30 = 2583 tons South St, 216 South St – High St                        825 x 30 = 310 tons

North Meadows — total 8719 tons

CVS to Dale St                                                         1740 x 45 = 978 tons

Dale St – West St                                                  2966 x 44 = 1631 tons

West St – Town Line                                             11,110 x 44 = 6110 tons
Main Street – total 6620 tons
Spring St – Millis line             3929 x 44 = 2160 tons

Brook St – Nebo                        6197 x 33 = 2556 tons

Nebo to town line                    3905 x 39 = 1904 tons
North Street – total 2560 tons

Harding St – town line              7584 x 27 = 2560 tons

Road work this summer

Ken Feeney reports that the following roads will get chip sealed this summer –

Adams – Cottage to Dale
Adams – West to West Mill
Bishop Lane
Bridge Street
Clayton Street
Copperwood Road
Cottage Street
Frairy Street
Mitchell Place
Mitchell Street
School Street
Upham Road
Vinald Road
Winter Street
CEMETERY

Plus Hospital Road after the water main is installed

Pavement management plan needed

The Massachusetts Municipal Association’s magazine is called the Municipal Advocate.  They had the recent article (below) on the benefits on having a pavement management plan.  I will be asking that Medfield institute a pavement management plan.

MUNICIPAL ADVOCATE Vol. 27, No. 2 25

Investing in Pavement Management

CAN IMPROVE ROADS, SAVE MONEY

The largest portion of your community’s infrastructure is literally under your feet—or your tires. A community’s pavement network allows residents and commerce to move from place to place, provides for efficient response time during emergencies, and offers safe bus routes to get children to school. Paved roads are, by far, the nation’s primary mode of transportation. For this reason, rebuilding, maintaining and preserving the condition of our pavement should be a top priority.
The aftereffects of serious winter storms can serve to remind us of the generally poor state of local roadway networks throughout Massachusetts. The reoccurring potholes, crumbling roadway edges, and new and deeper cracks that emerge in late winter and early spring are a fact of life, due largely to New England’s freeze/thaw cycles. The American Society of Civil Engineers reports that 41 percent of the major roads in Massachusetts are in poor or mediocre condition. Funding to repair and rebuild municipal roads is woefully inadequate, however. (See related stories, this issue.) A solution to this quandary for cities and towns may be an effective pavement management system.
A pavement management system—most likely the oldest type of asset management known to highway and transportation officials—is a long-term, formalized approach to gathering information about a community’s roadway network. Municipal officials then use the data to make informed roadway repair and maintenance decisions, prioritizing work to ensure the best return on investment. A pavement management system is a cost-effective tool for improving pavement conditions and maximizing the limited roadway repair and reinvestment dollars available to municipalities. A pavement management system can also help to build a case for additional funding for roadway infrastructure.
Some municipalities do an excellent job of pavement management, says John Livsey, the town engineer in Lexington, but most don’t have a strong enough grasp of the concept to benefit from its use. “I find that there is not a good understanding of pavement management among many of my peers,” he says. “For the majority of the towns I’m familiar with, the people who manage the roads don’t follow a pavement management process.”
WHAT IS PAVEMENT MANAGEMENT?
A pavement management system is a geographic information system-based technology used to measure a community’s entire road system, evaluate its road conditions, and log this data in a comprehensive database. The data are then analyzed and used to develop several important tracking metrics, including the average Pavement Condition Index (PCI). The backlog of needs is expressed in
both miles and dollars. Public works staff and other municipal officials respon-
Investing in Pavement Management
CAN IMPROVE ROADS, SAVE MONEY
By William Scarpati and Jerry Guerra
A public works crew does preventive maintenance on a road rated in “good” condition, which will extend its lifespan.
COURTESY PHOTO
William Scarpati is Senior Asset Management Specialist and Jerry Guerra is Manager of Marketing & Strategic Business Development for Fay, Spofford & Thorndike, a transportation engineering, planning and environmental consulting firm based in Burlington.
MUNICIPAL ADVOCATE Vol. 27, No. 2 23
sible for the pavement management
program monitor the metrics, setting and
measuring goals and results relative to
pavement condition and sustainability.
The idea is to take a comprehensive,
long-range view of a community’s roadway
assets. After completion of an initial
pavement management study, communities
usually make an upfront commitment to an
annual investment in maintenance,
including a strategic and balanced program
of resurfacing and base rehabilitation
improvement projects. Major reconstruction
projects are typically scheduled in later
years of the plan.
After conducting the study, communities
will sometimes, though not always, increase
their roadway budget. Rarely is the
additional investment enough to cover all
the work that’s needed, but with a strategic
program of maintenance and repair in
place (i.e., a pavement management system),
the dollars spent go a lot farther.
Livsey has overseen pavement
management programs in two towns, first
in Billerica and now in Lexington. “One
thing I hear from a lot of my peers is that
they can’t have a pavement management
program because they don’t have enough
funding,” he says. “I’d argue that it’s even
more important to follow a pavement
management program if funding is tight.
Once you begin following the early steps
and seeing how it works, you can make a
stronger case to the community to fund
roadway improvements. It builds on itself.”
A pavement management system can
alter the way municipal leaders think about
roadway maintenance. Typically, it will
turn the “worst-first” mentality completely
around. Fixing streets in the worst condition
first may seem like common sense, but it is
actually not the most efficient or costeffective
way to proceed. With a pavement
management system, municipalities can
clearly see the flaw in this thinking. Rather
than exhausting their budget to reconstruct
a one-mile stretch of roadway in poor
condition, with the same dollars a
community may be able to preserve or treat
eight miles of roadway in somewhat less
dire condition.
“The most important thing to understand
is that you need to do basic repairs and
general road maintenance early in the
process or pavement lifecycle,” says Steven
Tyler, superintendent of utilities and
facilities for the town of Spencer. “Those
are the least expensive repairs and, because
of it, they’re the most valued repairs. That’s
Failed
Very Poor
Poor
Fair
Good
Excellent
Pavement Deterioration Curve
40% Drop
in Quality
40% Drop
in Quality
12% of Life
Will Cost $8
to $10 Here
75% of Life $1 for Renovation Here
Time
Condition
DO NOTHING
PCI Band #1 (100–88 PCI)
Excellent Condition — in need of no immediate maintenance.
ROUTINE MAINTENANCE
PCI Band #2 (87–68 PCI)
Good Condition — may be in need of crack sealing or minor localized repair
PREVENTIVE MAINTENANCE
PCI Band #3 (37–47 PCI)
Fair Condition — pavement surface in need of surface sealing or thin overlay
STRUCTURAL IMPROVEMENT
PCI Band #4 (46–21 PCI)
Poor Condition — pavement structure in need of additional thickness to resist traffic loading
BASE REHABILITATION
PCI Band #5 (20–0 PCI)
Failed Condition — in need of full depth reconstruction/reclamation.
The PCI ranges given in this table are general averages. The actual treatment band threshold numbers depend on pavement surface type and
functional classification
(PCI) Treatment Band Ranges
24 MUNICIPAL ADVOCATE Vol. 27, No. 2
where the gap is. A lot of people in my
position don’t understand how critical it is
to spend money on roads in good condition
before you spend it on roads in bad condition.”
It’s a lot less expensive to maintain
pavement in decent condition—thereby
extending its useful lifecycle before it needs
replacement—than it is to completely
reconstruct a road that’s in poor condition.
At the same time, good maintenance of a
large portion of a community’s roadway
system helps to build public support and a
greater willingness to finance additional
repairs. “When people see the town doing
maintenance, and see that we’re taking care
of fifteen miles of road instead of three,
and it’s not just raw improvements, that
helps to get buy-in from the community,”
says Livsey.
THE PAVEMENT
MANAGEMENT
PROCESS
There are many ways to do pavement
management. Many cities and towns hire
an outside engineering firm or pavement
management consultant that incorporates
advanced software products, while others
choose to perform the duties in-house.
In the latter case, communities may use
technology as simple as spreadsheet software.
One approach to pavement management
includes the following steps:
1. Project Initiation Meeting: Consultants
meet with key community officials (e.g.,
DPW director, town/city manager, town/
city engineer) to establish goals, collect
existing data and prioritize the work areas.
2. Database Construction: The project
team collects and enters existing data
into the software, configuring the program
to prepare it for additional data entry.
3. Pavement Data Collection: An
inventory and evaluation of pavement
conditions is conducted for the agreedupon
roadway miles. Factors considered
include material type, age, geometry,
drainage, substructure conditions and
construction history, as well as basic
geophysical segmentation, average daily
traffic (if available), functional class,
curb reveal, and thickness (if available).
The comparative measure of this
information is the Pavement Condition
Index, which is rated on a scale of 0
(worst) to 100 (best). PCI surveying
practices and calculation methods
have been standardized by ASTM
International and accepted by the
American Association of State Highway
Transportation Officials. Typically,
communities strive for a PCI in the low
80s on their major arterial/collector
streets and high 70s on their local
roadway network.
4. Quality Assurance, Strategy Meeting
and Data Analysis: After ensuring
the integrity of the data, the consultant
and municipal officials meet to review
the findings, discuss the community’s
repair policies and prioritize objectives
to develop a long-term pavement management
strategy. The consultant then
determines what the repair “backlog” is
and establishes priorities, costs and
alternatives for stemming the pavement
network’s deterioration and moving
toward improvement.
5. Report of Findings: Data, costs and
alternatives are condensed into a report,
expressed in layman’s terms and
incorporating graphs, charts, tables and
other illustrations to better explain the
findings and proposed solutions.
6. GIS Integration: If a community has a
geographic information system available,
analysts develop a linear route system to
aid in the development of a new pavement
data layer in the system.
7. Training and Guidance: Consultants
will train community officials to
understand and use the software, while
remaining available to assist with the
implementation of the program. In many
cases, when the consultation is ongoing,
an annual status report is also part of
the process.
Even if a community is not willing or
able to engage an outside expert to
implement a pavement management system,
this should not prevent officials from
benefitting from the concept.
“It can be done at many different levels,”
says Lexington’s Livsey. “We had the
money to hire a consultant, so that’s what
we did. But a town can still go out there and
do an evaluation of their roads using a more
rudimentary scaling system. You need
some knowledge of the process, but you
can put together a system in a spreadsheet.
With in-house staff, you wouldn’t have the
power of [a commercial software] model,
and you don’t have someone whose sole
focus is the pavement management system
like you do with a consultant, but you
would at least get a decent understanding of
the funding you need.”
Realistically, communities with more than
100 miles of roadway may have a difficult
time conducting a comprehensive pavement
management review in-house. But the
bottom line is that any pavement management
system is better than nothing at all.
KEYS TO SUCCESS
Even communities that invest the time and
money in a pavement management system
can falter in the process. Turnover in key
positions or a shift in funding priorities can
spell trouble.
There are, however, some prescribed
steps that can improve a community’s
chances of benefitting from an investment
in pavement management.
• Ensure buy-in at the top. If a municipality’s
governing bodies and officials don’t
support the pavement management
system—or worse, don’t understand why
they’re doing it—it will more than likely
run off the rails. Communities with the
best pavement management results tend to
have political leadership with a strong
commitment to changing for the better
their approach to pavement repair and
maintenance.
• Identify project champions. Change is
often met with fear and resistance. The
person in the organization charged with
ensuring implementation of the pavement
management system must also be its
greatest advocate, stopping at nothing
until it is accepted and considered the

guiding force behind the pavement repair and maintenance process. The higher in the organization this person is, the better. It is also critical to identify additional champions to carry on this leadership should the primary person move on to another job.
• Select a software package that is best suited for your organization. Employing technology to solve problems can sometimes complicate a process, especially in the short term. As noted earlier, small and rural communities with a relatively low number of roadway miles can use a simple spreadsheet program. Larger and more urbanized municipalities should consider investing in a comprehensive asset/work order management software program that can address not only pavement, but also water, sewer, sidewalks, ramps, signs, signals and other systems. Whichever approach a community takes, officials should ensure that the program is robust enough to address issues such as short- and long-term prioritization, spending optimization, reporting and querying capabilities, and so on. And don’t skimp on training; the best system in the world is useless if the people who matter don’t know what it can do or how to use it.
• Conduct a quality assurance review of pavement management data. Proper analysis and planning require accurate data. Identify what you’re going to collect, why you need the information, how you will use it and so on. Identify the appropriate data and models required to produce the desired output. Conduct a pilot—select a snow route, district or ward to test data collection and modeling. Perform tests to ensure that the collected data is uniform and consistent, especially when multiple personnel are gathering and entering data.
• Deliver a readable and useful report. The people reading the data are likely to have a range of technical knowledge, so it is imperative to use language that is understandable to a wide audience. Express data and recommendations with terms such as dollars, miles, and months or years. Recommendations should be clear and candid. Tell it like it is.
• Continually update the pavement management database. Pavement/asset management is a living process. It should not be done once and then followed—or worse, forgotten. If pavement management is to be beneficial, the community needs to maintain accurate and up-to-date records of repairs, costs, schedules and so on. One rule of thumb is to inspect between one-quarter and one-third of the roadway network every year.
LONG-TERM BENEFITS
It’s tempting to look at pavement management as a quick fix or a silver bullet for all of a community’s roadway woes. While pavement management does offer some immediate benefits, this is not the primary motivation. A pavement management system is a long-range plan that will stretch a roadway repair budget and will eventually result in a vastly improved system. The plan typically covers a period of three to five years, with a focus on the work that is necessary to bring the roadway system up to more acceptable standards.
Identifying a community’s backlog of work, and the costs associated with addressing these needs, helps the community effectively manage the finances of its roadway infrastructure program. The pavement management system becomes the blueprint for a proactive, cost-effective preservation and maintenance program, as well as the foundation for a strategic capital infrastructure improvement plan.
The benefits don’t end with roads, however. Pavement management systems can be shared and coordinated with utility companies, for example. Before a city or town invests in a resurfacing project, it can ensure that any conflicts with utility infrastructure are addressed.
A pavement management plan overlaid with other condition assessments can help communities make better decisions about all of their assets. One example is sidewalk condition data, which allows a community to address issues related to compliance with the Americans with Disabilities Act by identifying problem areas. This includes costs and a timetable for corrective measures.
So what should a community do first? “I suggest talking to some neighboring communities to see what they’re doing and what’s working for them,” says Tyler. “When taking on a challenge of this nature, I feel more comfortable talking with my peers. If they have a pavement management plan, what do they like and what don’t they like, what works, how do they manage the data?
“Despite the challenges, pavement management has definitely benefitted Spencer. We’ve used it to make the public more aware of these concepts, and it has helped us get additional funding to improve the condition of our roads. When you document the issues and show the level of dollars needed, it makes you feel better about the decisions being made on where to spend money.”

MMA on Transportation bill

This today from the Massachusetts Municipal Association –

Tuesday, April 15, 2014

TRANSPORTATION CONFERENCE COMMITTEE AGREES ON $300 MILLION FOR CHAPTER 90 IN FISCAL 2015

House & Senate to Vote on Transportation Conference Committee Report this Week

Ch. 90 Funds Should be Available Immediately After the Bill is Signed into Law

Early last night, the House-Senate conference committee reached agreement on the final version of the Legislature’s statewide transportation bond bill, and filed the compromise measure with the House Clerk. This sets up a final vote to approve the bill and send it to the Governor’s Desk this week. The House plans a vote on Wednesday, April 16, and the Senate plans a vote the next day. After that, the Governor will have 10 days to sign the bill.

Lawmakers have stated that they have written the final bill to include the so-called “terms bill” language that has usually passed as separate legislation after the Governor signs the bond bill. This is intended to eliminate the long delay between enactment of the bond bill and the official release of Chapter 90 and other transportation funds. Absent unforeseen developments, this means that the fiscal 2015 provisional Chapter 90 authorization letters will become official once the Governor signs the bond bill into law.

The sweeping 5-year $13 billion bond bill includes a $300 million Chapter 90 authorization for fiscal year 2015, matching the fiscal 2014 authorization passed last summer. In spite of the higher authorization from the Legislature, the Patrick Administration has already announced that they plan on releasing just $200 million. On April 1st, MassDOT sent provisional letters of authorization to cities and towns announcing that they plan on officially releasing $200 million after the passage of the transportation bond bill.

The release of the full $300 million Chapter 90 authorization continues to be a major issue of contention between the Legislature and the Governor, with lawmakers siding with local officials in support of releasing the full amount. The House chair of the transportation committee stated this week that the Legislature will continue to support $300 million for Chapter 90, and that the authorization would stay in place so that the current Administration or the new Governor in January could act to release the full amount.

Earlier this year, lawmakers in the House and Senate had each approved different versions of the statewide transportation bond bill that includes future funding for the vital Chapter 90 program for the maintenance and repair of local roads. The Senate bill included a $1.5 billion Chapter 90 authorization intended to provide $300 million in annual funding over the next five years, from fiscal 2015 through fiscal 2019. The House bill provided only one year of funding at $300 million for fiscal 2015. Language in the Senate bill included several new rules governing the use of Chapter 90 funds that would have reduced local flexibility to address municipal needs by imposing unnecessary and overreaching new reporting and accounting requirements. The House did not include this language.

The final compromise bill ironed out by the House and Senate conferees settled on the House’s one-year Chapter 90 authorization at $300 million, and softened the restrictions proposed by the Senate. The final bill states that a community will only be able to carry forward more than 50 percent of the allocated Chapter 90 authorization from one year to the next if the city or town submits a 5-year spending outline to MassDOT. Also, the bill includes language requiring MassDOT to provide “preliminary notice” of the Chapter 90 authorizations by March 1 of each year. This is a change from past practice in previous Chapter 90 bond bills, which included language requiring cities and towns to receive official notice of their Chapter 90 authorizations by April 1 of each year.

Clearly, municipal leaders have succeeded in convincing Representatives and Senators of the need to increase Chapter 90 funding to $300 million a year – that is a significant victory. Winning release of the full $300 million will continue to be a top priority for the MMA, and we will not cease until all of the funds flow directly to cities and towns. In addition, we will continue to monitor the state’s administration of the Chapter 90 program to secure timely notification and release of the funds to maximize planning and make full use of the construction season, and oppose any state rules to restrict local flexibility.

The MMA is continuing to analyze the details of the sweeping transportation bond bill, so please check the MMA website at www.mma.org for more information. Thank You.

 

Chap. 90 monies may get funded

This courtesy of Statehouse News Service, by way of John Nunnari –

DEAL REACHED ON MULTI-YEAR $13B TRANSPO BOND BILL:
House and Senate negotiators reached a deal Monday afternoon on a $13 billion transportation borrowing bill that includes a one-year $300 million authorization for local road repairs in fiscal 2015 and funding for the Green Line extension, South Coast rail, the expansion of South Station and scores of other local projects. The House, which plans to meet on Tuesday in an informal session, could accept the report of the conference committee ( H 4046) and schedule a vote to engross the bond bill for Wednesday. The Senate could take it up as soon as Thursday when it plans to meet in a formal session. The compromise bill was negotiated by Transportation Committee Chairmen Rep. William Straus and Sen. Thomas McGee, Reps. Stephen Kulik and Peter Durant, and Sens. Stephen Brewer and Robert Hedlund. Straus told the New Service that despite cities and towns being informed by the Patrick administration to only expect $200 million in Chapter 90 road money this year, he’s hopeful the full amount will be eventually authorized. The conferees opted against a five-year Chapter 90 authorization as proposed in the Senate version of the bill. “We’ve authorized $300 million because we believe that’s a reasonable level and it did not escape our attention that Deval Patrick will only be governor for half of the next fiscal year. It may be that the next governor is inclined to make full use of the $300 million authorization,” Straus said. The bill also includes language to preserve the “right of way” and spend up to $2 million to update environmental impact documents related to a potential underground rail link between North and South stations. In addition to authorizing the purchase of new Red and Orange Line cars, Straus said the conference report also calls for those T cars to be assembled in Massachusetts and requires the potential for job creation to be considered when choosing a location where the work will be done. The bill would also earmark $65 million for the dredging of Boston Harbor to increase the depth of the port and make it more accommodating to large cargo ships. “There’s a lot of competition with East Coast cities and to get Boston harbor to a good 40 foot depth is important,” Straus said. To view the full conference report, visit: http://www.statehousenews.com/docs/2014/04-14_TranspoBondBill.pdf – M. Murphy/SHNS

John Nunnari, Assoc AIA
Executive Director, AIA MA

$59,369 of state pothole money

Email yesterday from Mike Sullivan –


We received a letter from the Mass Dept of Transportation this morning advising us that our share of the $30 million in pothole money for street repairs was $59,369. These funds must be obligated by June 30, 2014 and spent by September 30, 2014 on road repairs or other limited projects related to damage from this winter’s weather. We have to return a contract form signed by the Chairman within a week, so I asked Evelyn to add it to the agenda. I also spoke to Ken and he felt the best use of the money would be to expend it on crack sealing and sealcoating. He said that he gave you a list of streets when he met with you recently, so you may wish to review it before tomorrow night

Mike