Road work this summer


Ken Feeney reports that the following roads will get chip sealed this summer –

Adams – Cottage to Dale
Adams – West to West Mill
Bishop Lane
Bridge Street
Clayton Street
Copperwood Road
Cottage Street
Frairy Street
Mitchell Place
Mitchell Street
School Street
Upham Road
Vinald Road
Winter Street
CEMETERY

Plus Hospital Road after the water main is installed

4 responses to “Road work this summer

  1. Diane Johnson's avatar Diane Johnson

    Hello,

    I am not sure what chipped sealed means but the top of Marlyn Rd. off of Harding is in poor shape also.

    Please note: message attached

    Like

    • Select Board member Osler "Pete" Peterson's avatar Selectman Osler "Pete" Peterson

      Chip seal is the treatment Medfield does on the side streets, which consists of a layer of heavy oil or light asphalt based material onto which a layer of stones in rolled. See

      Like

  2. Mary Dirrane's avatar Mary Dirrane

    Pine St. is terrible also.